INSP-Final Inspection | 1/14/2016 | 1/15/2016 | 1/15/2016 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/13/2016 | 1/14/2016 | 1/14/2016 | P | FAIL |
Troy Cobbley
|
|
|
Need the as-built drawings as discussed and then the project can be finaled.
|
Telephone call | | | 1/6/2016 | | DONE |
|
|
|
Scott Arrelano received a call from the property manager indicating roof top units 14 and 15 will be decommissioned from use. Both units are to have electrical and gas connections removed and locked out from further use. They are to be abandonded in place due to prohibitive cost of removing them.
|
Miscellaneous action | | | 1/6/2016 | | DONE |
|
|
|
Marv Meyer of Russell Corp. sent a pdf file that shows all rooftop HVAC equipment locations including units 10 and 14 that are being decommissioned. The drawing has been uploaded into documents.
|
INSP-Final Inspection | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | FAIL |
Troy Cobbley
|
|
|
Fire alarm testing complete. Need the non-functional hvac units repaired or removed. If repaired I need to finish testing. If removed I need revised drawings.
|
Permit Ready to Issue | | | 2/2/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/2/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/2/2015 | | 2/2/2015 | | DONE |
Brittany Hill
|
|
|
|
INSP-Final Inspection | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | FAIL |
Troy Cobbley
|
|
|
Need plan modificatios and the hvac unit/shut down addressed.
|
Alarm Plan Check | 1/30/2015 | | 1/30/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/30/2015 | | DONE |
|
|
|
Plan modification allprved with drawing notation and review comments. Taken to front desk for processing.
|
Inspection Record Card- Fire | 1/30/2015 | | 1/30/2015 | | DONE |
Brittany Hill
|
|
|
|
INSP-Final Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | A | FAIL |
Troy Cobbley
|
|
|
We were only able to test one duct smoke detector due to not being able to get the remaining hvac units to function. I noted that the smoke detectors for the fire door release do not appear to be installed per NFPA 80 and Chapter 17 of NFPA 72
|
INSP-Final Inspection | 1/29/2015 | 1/30/2015 | 1/29/2015 | A | CANC |
Troy Cobbley
|
|
|
Please notify Greg 30 min. prior to arrival. Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker
|
Plan resubmittals received | | | 1/29/2015 | | DONE |
|
|
|
Two copies of Application/booklet, FA00 and FA2.0
|
INSP-Final Inspection | 1/27/2015 | 1/28/2015 | 1/28/2015 | A | FAIL |
Troy Cobbley
|
|
|
Resubmit plans for a "plan modification" for the additional flow switches, tamper switches and the cellular dialer. Provide auto-resetting tamper switches on the existing anti-freeze loop control valves, repair or remove the non-functional hvac units to facilitate the testing of the duct smoke detectors, remove or provide connection to the door mags.
|
Issue and Print Permit | | | 11/13/2014 | | DONE |
|
|
|
|
Telephone call | | | 11/4/2014 | | |
Candy A. Nichols
|
|
|
called Greg tof let know plan mods plans are ready and how much is owed. Left message on his machine
|
Inspection Record Card- Fire | 11/4/2014 | | 11/4/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Lee) | 10/31/2014 | | 11/3/2014 | | DONE |
Lee G Meredith
|
|
|
|
Alarm Plan Check | 11/3/2014 | | 11/3/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/3/2014 | | DONE |
|
|
|
Plans approved with review comments. taken to front desk for processing.
|
Plan resubmittals received | | | 10/31/2014 | | DONE |
Christina Prado
|
|
|
**PLAN MOD** received two sets of revised apps, plans and submittal packet;Plans taken to Lee for further review
|
INSP-Final Inspection | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | FAIL |
Troy Cobbley
|
|
|
Provide city approved data sheets and as-builts/submittals as discussed. Functional testing of system passed.
|
CHANGE STATUS TO (ISS) | | | 8/8/2014 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 7/21/2014 | | 7/28/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/28/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 7/28/2014 | | 7/28/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/28/2014 | | DONE |
|
|
|
Review passed. As built floor plans with calculations to be provided at acceptance test. Documents taken to front desk for processing.
|
Telephone call | | | 7/28/2014 | | DONE |
Christina Prado
|
|
|
Called Greg to advise permit is ready for pick up and gave fees due
|
Permit Ready to Issue | | | 7/28/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 7/28/2014 | | 7/28/2014 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 7/22/2014 | | DONE |
|
|
|
Mary Froemke call to say that the perminant power for this site (BLD14-01680) was being removed and temporary power was being supplied until the demo work was finished and the existing building was seperated into 2 buildings. Because of this, the existing fire alarm system will need to be repaced and 2 systems installed. To keep sprinkler monitoring intact, new panels will be installed. A plan modification will be submitted with floor plans showing vanilla finish sprinkler montioring. I informed her that this was acceptable to keep the systems properly monitored but systems will need to have all required detection and off site monitoring installed ASAP to insure constant monitoring. (Also see FIR14-00517)
|
Application received | | | 7/21/2014 | | |
|
|
|
|