INSP-Final Inspection | 10/27/2014 | 10/28/2014 | 10/28/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro tests passed for both systems.
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2014 | 9/8/2014 | 9/8/2014 | P | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed due to visable drop in pressure on the guages.
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2014 | 9/5/2014 | 9/5/2014 | A | CANC |
Troy Cobbley
|
|
|
Early AM please if possible. Matt is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 9/4/2014 | 9/5/2014 | 9/4/2014 | A | CANC |
Troy Cobbley
|
|
|
For early am if possible. Ken is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | CANC |
Troy Cobbley
|
|
|
Dry pendant leaking so no hydro today. Will be rescheduled per Matt.
|
INSP-Sprinkler Rough-in/Hydro | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 9/2/2014 | 9/2/2014 | P | CANC |
Troy Cobbley
|
|
|
Matt is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | FAIL |
Troy Cobbley
|
|
|
Matt is the contact. Thanks Phone #: ###-#### Left message on contacts voice mail that I was on the way. Arrived at job site and contact was not there. No underground flush performed. Also this permit number is for the overhead not the underground
|
Sprinkler Plan Check | 8/6/2014 | | 8/6/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
Issue and Print Permit | | | 8/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Fire | 8/6/2014 | | 8/6/2014 | | DONE |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 7/30/2014 | | 7/30/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 7/30/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 7/30/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 7/29/2014 | | 7/29/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 7/25/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 25 2014 2:11PM
|