Permit Information
Permit NumberFIR14-00562
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 2610 E AMITY RD
Project NameTrust Joist (Demo)
Customer Number 
ePlanReviewYes
Description
OWNER INTENDS TO DEMOLISH A LARGE PORTION OF THEIR EXISTING PRODUCTION PLANT THAT WILL NO LONGER BE USED. THE AREA OF DEMOLITION IS BETWEEN COLUMNS C & E.
VIKING TO REMOVE THE EXISTING 6" FEED MAIN FROM TOP OF WET RISER TO ITS CONNECTION TO THE CROSS MAIN AT WEST SIDE OF BUILDING. THIS MAIN TO BE SET ASIDE TO REUSE FOR NEW SUPPLY TO BRANCH LINES AT NEW WALL LOCATION.
VIKING TO CUT 30 BRANCH LINES OFF AT NEW WALL LOCATION SO THE WEST SIDE OF THE STRUCTURE CAN BE DEMOLISHED.
AFTER THE BUILDING HAS BEEN DEMOLISHED A NEW WALL WILL BE BUILT AT COLUMN LINE C'. AT THAT POINT TWO NEW CROSS MAINS WILL BE INSTALLED ALONG THIS WALL AND THE BRANCH LINES WILL BE RECONNECTED TO THESE CROSS MAINS. THIS WORK IS NOT IN THIS SCOPE.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/20149/23/20149/23/2014PPASS
DetailsForrest France
Scope of permit work completed. Fire sprinkler permit finaled.
INSP-Final Inspection9/19/20149/23/20149/23/2014APASS
DetailsForrest France
Scope of work completed includes disconnect of supply lines to the demo portions and reconnect of new main and branchlines at areas to remain in service. Walkthrough passed with note to provide protection at OH doors in conjunction with inspection for new west wall construction.
Sprinkler Plan Check8/27/2014 8/27/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/27/2014 DONE
DetailsTim Frost
Permit Ready to Issue  8/27/2014 DONE
DetailsCandy A. Nichols
Issue and Print Permit  8/27/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire8/27/2014 8/27/2014 DONE
DetailsCandy A. Nichols
Telephone call  8/11/2014 DONE
Spoke with Rick at Viking. Told him the system must remain active at all times. There is to be no more than 8 hours of impairment at a time. Told him he could keep it as a pipe schedule system. I said I need a letter sign and dated by someone at the company limiting the storage to no higher than 12'. I needed new accurate drawing show the new main that is replacing the existing main. The main will be moved east from column line D to column line C and size for pipe schedule. Rick, said this building does not have production, the building is used strictly for storage of lumber only products, NO plastics.

Sprinkler Plan Check8/8/2014 8/8/2014 FAIL
DetailsTim Frost
1st review completed  8/8/2014 FAIL
DetailsTim Frost
Early Start  8/8/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)8/7/2014 8/7/2014 DONE
DetailsTim Frost
Application received  8/4/2014 DONE
Application submitted via PDS Online on Aug 4 2014 4:06PM