INSP-Final Inspection | 10/23/2014 | 10/24/2014 | 10/24/2014 | A | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work completed. Permit final approved.
|
INSP-Supply line flush | 10/23/2014 | 10/23/2014 | 10/23/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 10/1/2014 | 10/2/2014 | 10/2/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line including the IBR to the point of connection okayed for bury. Need to provide as-built for field modification to include a 45 ell.
|
Plan assigned to (Tim) | 8/6/2014 | | 8/6/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/6/2014 | | 8/6/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/6/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 8/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 8/6/2014 | | 8/6/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 5 2014 1:14PM
|