INSP-Final Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered
|
INSP-Sprinkler Rough-in/Hydro | 1/12/2015 | 1/13/2015 | 1/13/2015 | A | PART |
Troy Cobbley
|
|
|
Rough-in and overhead hydro passed. Tenting failed. Piping can not be covered until a tenting inspection is passed.
|
INSP-Sprinkler Rough-in | 11/4/2014 | 11/5/2014 | 11/5/2014 | A | PASS |
Troy Cobbley
|
|
|
Remaining underground piping is ok to cover
|
INSP-Sprinkler Rough-in | 10/22/2014 | 10/22/2014 | 10/22/2014 | P | PART |
Craig D. Hanson
|
|
|
This was to inspect the rough underground from street to future building so that line can be covered. No hydro done. Depth of cover is good.
|
Plan assigned to (Tim) | 8/12/2014 | | 8/12/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/12/2014 | | 8/12/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/12/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 8/12/2014 | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2014 10:52AM
|