INSP-Final Inspection | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | PART |
Forrest France
|
|
|
Tenting inspection at the second floor completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 11/5/2014 | 11/5/2014 | 11/5/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in and overhead hydro tests passed. No covering of piping until a tenting inspection. FDC to face street.
|
INSP-Supply line flush | 10/31/2014 | 11/3/2014 | 11/3/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 9/29/2014 | 9/29/2014 | 9/29/2014 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok to cover.
|
Plan assigned to (Tim) | 8/12/2014 | | 8/12/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/12/2014 | | 8/12/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/12/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/12/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 8/12/2014 | | 8/12/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/9/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2014 11:00AM
|