INSP-Final Inspection | 1/26/2015 | 1/27/2015 | 1/27/2015 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 1/23/2015 | 1/27/2015 | 1/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/22/2015 | 1/23/2015 | 1/23/2015 | P | CANC |
Troy Cobbley
|
|
|
cancelle per Pat. frozen pipe// Mike M is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2015 | 1/20/2015 | 1/20/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2014 | 12/18/2014 | 12/18/2014 | P | PASS |
Troy Cobbley
|
|
|
The tenting and rough-in and hydro test for the overhead passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 12/17/2014 | 12/17/2014 | 12/17/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting failed. No time to perform a hydro test
|
INSP-Sprinkler Rough-in | 12/15/2014 | 12/16/2014 | 12/16/2014 | P | FAIL |
Troy Cobbley
|
|
|
Tenting has not been repaired. Piping can not be covered.
|
INSP-Sprinkler Rough-in | 12/10/2014 | 12/11/2014 | 12/11/2014 | A | FAIL |
Forrest France
|
|
|
Tenting at the second floor is not adequate, missing and partial insulation coverage at some locations. Noted one open outlet. Sheetrock cover is not approved at this time.
|
INSP-Sprinkler Rough-in | 9/15/2014 | 9/16/2014 | 9/16/2014 | A | PASS |
Troy Cobbley
|
|
|
Underground supply is ok to cover.
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 8/18/2014 | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 8/15/2014 | | 8/15/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/15/2014 | | 8/15/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/15/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 12 2014 2:22PM
|