INSP-Final Inspection | 11/13/2014 | 11/13/2014 | 11/13/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work finaled.
|
INSP-Sprinkler Rough-in | 8/20/2014 | 8/20/2014 | 8/20/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Don stated that a soffit is going to be installed between the two side wall heads
|
Plan assigned to (Tim) | 8/18/2014 | | 8/18/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/18/2014 | | 8/18/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/18/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 8/18/2014 | | 8/18/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Application received | | | 8/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 15 2014 12:40PM
|