INSP-Final Inspection | 9/18/2014 | 9/19/2014 | 9/19/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit work passed final inspection.
|
INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications at the conference room are approved for ceiling cover.
|
Plan assigned to (Tim) | 8/18/2014 | | 8/18/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/18/2014 | | 8/18/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/18/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/18/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/18/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/18/2014 | | 8/18/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/16/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2014 9:04AM
|