INSP-Final Inspection | 10/13/2014 | 10/14/2014 | 10/14/2014 | A | PASS |
Craig D. Hanson
|
|
|
new 30 cdl strobe installed. tested and pass
|
INSP-Final Inspection | 10/14/2014 | 10/14/2014 | 10/14/2014 | P | FAIL |
Troy Cobbley
|
|
|
We had no access to the fire alarm panel to perform the tests. Also need as-builts showing the correct wall layout and the Waiting area ceiling mounted strobe needs to be space correctly or the candella adjusted accordingly (show on as-builts).
|
Issue and Print Permit | | | 8/20/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/20/2014 | | 8/20/2014 | | DONE |
Tisha Gallop
|
|
|
|
Permit Ready to Issue | | | 8/20/2014 | | DONE |
|
|
|
|
Application received | | | 8/19/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2014 11:54AM
|
Plan assigned to (Lee) | 8/19/2014 | | 8/19/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/19/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 8/19/2014 | | 8/19/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/19/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|