INSP-Final Inspection | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PART |
Forrest France
|
|
|
Verified plan modification. Remainder of overhead work approved for cover.
|
Plan assigned to (Tim) | 9/3/2014 | | 9/3/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/3/2014 | | 9/3/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/3/2014 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 9/3/2014 | | DONE |
Christina Prado
|
|
|
Plan mod approved
|
Miscellaneous action | | | 8/29/2014 | | DONE |
|
|
|
On hold awaiting plan mod letter.
|
INSP-Sprinkler Rough-in | 8/25/2014 | 8/26/2014 | 8/26/2014 | A | PART |
Forrest France
|
|
|
Two offices as marked on plan and indicated on the scope of work are okay for cover. However, noted three additional locations in need of sprinkler coverage adjustments due to tenant remodel work-
|
Plan assigned to (Tim) | 8/21/2014 | | 8/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/21/2014 | | 8/21/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/21/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/21/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/21/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/21/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/21/2014 | | 8/21/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/19/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 19 2014 1:31PM
|