INSP-Final Inspection | 5/13/2015 | 5/14/2015 | 5/14/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 4/20/2015 | 4/20/2015 | 4/20/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked will need to reschedule
|
INSP-Sprinkler Rough-in/Hydro | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed, piping ok to cover.
|
INSP-Sprinkler Rough-in | 3/31/2015 | 4/1/2015 | 4/1/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has passed
|
INSP-Sprinkler Rough-in | 2/20/2015 | 2/20/2015 | 2/23/2015 | P | DONE |
Scott Arellano
|
|
|
to cover// brandon Phone #: ###-#### Cancelled per Brandon.
|
Permit Ready to Issue | | | 9/9/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/9/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/9/2014 | | 9/9/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 9/5/2014 | | 9/5/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/5/2014 | | 9/5/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/5/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 23 2014 10:50AM
|