INSP-Final Inspection | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Forrest France
|
|
|
Scope of fire sprinkler work completed and passed both rough-in and final inspections. Contractor to attatch auxillary drain sign at the drum drip as discussed.
|
Plan assigned to (Tim) | 8/29/2014 | | 8/29/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/29/2014 | | 8/29/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/29/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/29/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/29/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/29/2014 | | 8/29/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/27/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 27 2014 10:46AM
|