Permit Information
Permit NumberFIR14-00659
StatusFinaled
Name MICRON TECHNOLOGY INC FP
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 15 - First Floor
Customer NumberC21720
ePlanReviewNo
Description
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.

Micron Building #15 - (C21720) - Fab Remodel – Permit to remodel approximately 11,180 S.F. of space in B15 on the 1st Floor between gridlines 11 & 2 and G & L to accommodate a processing area for “SPECTECH”. Work to include: installation of new ceiling grid system, installation of new lighting / switching, construction of new interior non-load bearing walls to define this area off from the rest, modify the corridor to accommodate new entrance (Corridor downgraded), installation of new interior doors / accessible hardware, minor mechanical modifications, minor electrical, and interior finishes.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/26/20151/27/20151/28/2015APASS
DetailsForrest France
Scope of work completed, final walkthrough finished. Hydrostatic test passed.
Fees Due Hold1/6/2015 1/12/2015 DONE
DetailsChristina Prado
INSP-Sprinkler Rough-in/Hydro1/5/20151/6/20151/6/2015PPART
DetailsForrest France
Overhead work approved for cover between grid lines 9 and 11 north end as noted on plans. Rough-in of new branchlines and main at the remainder of grid ceilings okayed. Final hydrostatic test to be finished once drops are installed, heads relocated and old sprinklers are replaced per the scope of work.
Fees Due Hold12/22/2014 1/5/2015 DONE
DetailsChristina Prado
Issue and Print Permit  12/4/2014 DONE
DetailsChristina Prado
Plan assigned to (Tim)11/21/2014 11/21/2014 DONE
DetailsTim Frost
Sprinkler Plan Check11/21/2014 11/21/2014 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/21/2014 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/21/2014 DONE
DetailsTim Frost
Permit Ready to Issue  11/21/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire11/21/2014 11/21/2014 DONE
DetailsCandy A. Nichols
Telephone call  11/21/2014 DONE
DetailsCandy A. Nichols
called Paul to let know permit is ready and how much is owed
Application received  9/4/2014 DONE
This permit was created on the web by Paul Marcolina