INSP-Final Inspection | 1/26/2015 | 1/27/2015 | 1/28/2015 | A | PASS |
Forrest France
|
|
|
Scope of work completed, final walkthrough finished. Hydrostatic test passed.
|
Fees Due Hold | 1/6/2015 | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 1/5/2015 | 1/6/2015 | 1/6/2015 | P | PART |
Forrest France
|
|
|
Overhead work approved for cover between grid lines 9 and 11 north end as noted on plans. Rough-in of new branchlines and main at the remainder of grid ceilings okayed. Final hydrostatic test to be finished once drops are installed, heads relocated and old sprinklers are replaced per the scope of work.
|
Fees Due Hold | 12/22/2014 | | 1/5/2015 | | DONE |
Christina Prado
|
|
|
|
Issue and Print Permit | | | 12/4/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 11/21/2014 | | 11/21/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/21/2014 | | 11/21/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/21/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 11/21/2014 | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 11/21/2014 | | DONE |
Candy A. Nichols
|
|
|
called Paul to let know permit is ready and how much is owed
|
Application received | | | 9/4/2014 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|