INSP-Final Inspection | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. Horn strobe is ok.
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2015 | 3/11/2015 | 3/11/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. I verified canopies and flow switch function. Horn/strobe is ok.
|
INSP-Sprinkler Rough-in | 11/13/2014 | 11/14/2014 | 11/14/2014 | P | PART |
Forrest France
|
|
|
Verified cold cavity protection, tenting at the second floor and first floor garage living areas. Heated enclosure has been built for the system supply and feed mains over the breezeway. Fire sprinkler rough-in okayed for ceiling cover.
|
INSP-Conference | 11/12/2014 | 11/12/2014 | 11/13/2014 | P | DONE |
Forrest France
|
|
|
Regarding inspection notes, freeze protection at the breezeway, coverage adjustments, and tenting.
|
INSP-Sprinkler Rough-in | 11/5/2014 | 11/6/2014 | 11/6/2014 | A | FAIL |
Forrest France
|
|
|
Items noted include; missing tenting at the upper level and main level garage area rec room, bathroom & storage room, noted heat tape at the supply and system main piping in breezeway-plans indicate a conditioned space, relocated main 2nd floor, provide coverage at the concealed space above the gas fired fireplace, missing aux. drain basement level, added 90s at main and supply piping, provide 175deg. heads per plan at the furnace rooms.
|
Sprinkler Plan Check | 11/5/2014 | | 11/5/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/5/2014 | | DONE |
Christina Prado
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/5/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 9/24/2014 | | 9/24/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 9/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 9/24/2014 | | 9/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 9/11/2014 | | 9/11/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 9/11/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/11/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Plan assigned to (Tim) | 9/10/2014 | | 9/10/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 9/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2014 12:05PM
|