INSP-Final Inspection | 1/9/2015 | 1/12/2015 | 1/12/2015 | A | PASS |
Forrest France
|
|
|
Final inspection and functional testing completed. Low air switch adjusted while on site. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2015 | 1/7/2015 | 1/7/2015 | P | PART |
Forrest France
|
|
|
Concluded satisfactory pneumatic test of the new dry system.
|
INSP-Sprinkler Rough-in/Hydro | 1/2/2015 | 1/6/2015 | 1/6/2015 | P | PART |
Forrest France
|
|
|
Begin 24 hr. air test of the new dry system at 44 1/2 psig @2:00 PM.
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2014 | 1/2/2015 | 1/2/2015 | P | PART |
Forrest France
|
|
|
Rough-in inspection completed for new rack system sprinkler piping and modifications to existing overhead coverage. Noted one missing sprig to be added per plan note #15. Discussed 24 hr. air test.
|
Sprinkler Plan Check | 11/24/2014 | | 11/24/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 11/24/2014 | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Telephone call | | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
called Jim, talked to Josh and let him know that the permit is ready and how much is owed
|
Issue and Print Permit | | | 11/24/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Tim) | 9/8/2014 | | 11/24/2014 | | DONE |
Tim Frost
|
|
|
|
Plan resubmittals received | | | 11/13/2014 | | DONE |
Christina Prado
|
|
|
Received three sets of revised plan sheets, applications and submittal documents;Plans taken to TRF for review
|
Sprinkler Plan Check | 9/19/2014 | | 9/19/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 9/19/2014 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 9/19/2014 | | DONE |
Candy A. Nichols
|
|
|
called-talked to Jennifer-told her plan review was denied and they could come pick the plans up. They will need to bring in new plans
|
Miscellaneous action | | | 9/19/2014 | | DONE |
|
|
|
picked up failed plans-KRS
|
Application received | | | 9/8/2014 | | |
|
|
|
|
Case Summary | | | 9/8/2014 | | DONE |
|
|
|
|