INSP-Final Inspection | 4/1/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Tim Frost
|
|
|
Rough in was OK. Could not final because of missing ceiling tile.
|
INSP-Final Inspection | 9/11/2014 | 9/12/2014 | 9/12/2014 | A | PASS |
Tim Frost
|
|
|
Finaled passed
|
Plan assigned to (Tim) | 9/11/2014 | | 9/11/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/11/2014 | | 9/11/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/11/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/11/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/11/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/11/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/11/2014 | | 9/11/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/8/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2014 4:03PM
|