Case Summary | | | 2/2/2015 | | |
|
|
|
|
INSP-Final Inspection | 11/12/2014 | 11/13/2014 | 11/13/2014 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 10/16/2014 | 10/17/2014 | 10/17/2014 | P | FAIL |
Troy Cobbley
|
|
|
No testing was performed due to the fire alarm panel having a non-functional display. I spoke to the tenant about the need to have it repaired prior to an inspection. She was going to corrdinate with the fire alarm vendor on a solution.
|
Miscellaneous action | | | 9/11/2014 | | DONE |
|
|
|
The applicant emailed me to note a couple of typo's on the review comments including incorrect address and radio communicator brand name. I made the corrections and batch filed new review comments for them to download.
|
Application received | | | 9/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 10 2014 10:11AM
|
1st review completed | | | 9/10/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 9/10/2014 | | 9/10/2014 | | PASS |
Lee G Meredith
|
|
|
|
Plan assigned to (Lee) | 9/10/2014 | | 9/10/2014 | | DONE |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/10/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Permit Ready to Issue | | | 9/10/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/10/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/10/2014 | | 9/10/2014 | | DONE |
Christina Prado
|
|
|
|