INSP-Final Inspection | 2/4/2015 | 2/9/2015 | 2/9/2015 | A | PASS |
Forrest France
|
|
|
Scope of fire alarm work completed satisfactory. Functional testing passed. Permit finaled.
|
Permit Ready to Issue | | | 10/8/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/8/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/8/2014 | | 10/8/2014 | | DONE |
Kristal Soland
|
|
|
|
Plan assigned to (Lee) | 10/3/2014 | | 10/3/2014 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 10/3/2014 | | DONE |
|
|
|
Projectdox submittal upload completed by applicant 10/2/14.
|
Miscellaneous action | | | 10/3/2014 | | DONE |
|
|
|
I emailed the Neal Timmerman to ask if there was work to be done on the 5th floor since the riser indicates 27 new smokes that don't show on floor plans. He responded to indicate that the work is only on the 12th floor and that this was a typo.
|
1st review completed | | | 10/3/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 10/3/2014 | | 10/3/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/3/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Miscellaneous action | | | 9/17/2014 | | DONE |
|
|
|
I received an email from the applicant indicating that due to a personal emergency, he was unable to complete his projectdox upload of drawings and documents. He anticipates that he should have them complete before the end of this week.
|
Application received | | | 9/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 15 2014 11:34AM
|