INSP-Final Inspection | 1/20/2015 | 1/23/2015 | 1/23/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Permit Ready to Issue | | | 9/30/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 9/30/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/30/2014 | | 9/30/2014 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 9/29/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 29 2014 8:41AM
|
Plan assigned to (Lee) | 9/29/2014 | | 9/29/2014 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 9/29/2014 | | DONE |
|
|
|
The calculation sheets show 1 horn strobe for this project. Considering the size of the building, this is not enough. I emailed Jason Heath to let him know that city code does not allow partial notification coverage and to ask if this is a typo or existing. He responded to say that it was existing.
|
1st review completed | | | 9/29/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 9/29/2014 | | 9/29/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/29/2014 | | DONE |
|
|
|
plans approved with no review comments. Projectdox updated.
|