INSP-Final Inspection | 5/8/2015 | 5/8/2015 | 5/8/2015 | P | PASS |
Katie Marron
|
|
|
Scope of work complete. Permit finaled
|
INSP-Sprinkler Rough-in | 11/13/2014 | 11/13/2014 | 11/14/2014 | P | PART |
Forrest France
|
|
|
Verified added coverage per previous inspection notes.
|
INSP-Sprinkler Rough-in | 11/11/2014 | 11/12/2014 | 11/13/2014 | P | PART |
Forrest France
|
|
|
Refer to stamped plans for areas okay to cover. Noted two locations in need of additional coverage due to obstruction and overspacing. Need to provide walls to the deck or a drop ceiling at the storage room to maintain adequate protection.
|
Issue and Print Permit | | | 10/16/2014 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/16/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/16/2014 | | 10/16/2014 | | DONE |
Tisha Gallop
|
|
|
|
Plan assigned to (Tim) | 10/14/2014 | | 10/14/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/14/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 10/14/2014 | | 10/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/14/2014 | | 10/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/14/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/13/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 13 2014 8:21AM
|