INSP-Final Inspection | 8/19/2015 | 8/20/2015 | 8/20/2015 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection passed/complete
|
INSP-Sprinkler Rough-in/Hydro | 7/14/2015 | 7/15/2015 | 7/15/2015 | A | CANC |
Troy Cobbley
|
|
|
Tenting Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 6/15/2015 | 6/16/2015 | 6/16/2015 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2015 | 6/12/2015 | 6/12/2015 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed but the tenting is not correct in the A unit south east corner. Can not cover until repaired.
|
INSP-Sprinkler Rough-in/Hydro | 6/1/2015 | 6/2/2015 | 6/2/2015 | P | PASS |
Jim Page
|
|
|
Fire sprinkler overhead hydrostatic test passed/complete.
|
INSP-Supply line flush | 5/27/2015 | 5/28/2015 | 5/28/2015 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush passed
|
INSP-Sprinkler Rough-in | 4/23/2015 | 4/23/2015 | 4/23/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground supply is ok to cover
|
Permit Ready to Issue | | | 11/5/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 11/5/2014 | | 11/5/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Tim) | 10/27/2014 | | 10/27/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/27/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 10/27/2014 | | 10/27/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/27/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/27/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 10/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 15 2014 6:54PM
|