INSP-Final Inspection | 6/30/2015 | 7/1/2015 | 7/1/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 7/1/2015 | 7/1/2015 | 7/1/2015 | P | PASS |
Troy Cobbley
|
|
|
Hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/28/2015 | 5/27/2015 | A | PASS |
Troy Cobbley
|
|
|
Supply line flush passed
|
INSP-Sprinkler Rough-in | 5/7/2015 | 5/8/2015 | 5/8/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and tenting inspection passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 4/10/2015 | 4/10/2015 | 4/10/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground supply is ok to cover
|
Permit Ready to Issue | | | 11/5/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/5/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/5/2014 | | 11/5/2014 | | DONE |
Christina Prado
|
|
|
|
Sprinkler Plan Check | 10/17/2014 | | 10/17/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/17/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2014 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 10/16/2014 | | 10/16/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/16/2014 | | PASS |
|
|
|
|
Application received | | | 10/15/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 15 2014 7:37PM
|