Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR14-00770
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 12077 W OVERLAND RD
Project NameCantabria Bldg 19
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting, (4) two level apartments (townhouses). CPVC piping and extended coverage sprinklers are being utilized. The underground is 2” poly pipe. There will be a 1½” FDC.

To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/26/20158/27/20158/27/2015APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in6/22/20156/22/20156/22/2015PPASS
DetailsTroy Cobbley
Tenting and rough-in inspection passed. Piping can be covered. I noted a pin hole leak on a fitting that will need to be repaired prior to a hydro test.
INSP-Sprinkler Rough-in/Hydro6/3/20156/3/20156/3/2015APASS
DetailsJim Page
Fire sprinkler overhead hydrostatic test passed/complete.
INSP-Supply line flush5/27/20155/28/20155/28/2015APASS
DetailsTroy Cobbley
Underground supply line flush passed
INSP-Sprinkler Rough-in4/14/20154/14/20154/14/2015PPASS
DetailsTroy Cobbley
Underground ok to cover
Fees Due Hold11/5/2014 11/5/2014 DONE
Details
Fees Due Hold11/4/2014 11/4/2014 DONE
Details
Permit Ready to Issue  11/3/2014 DONE
Issue and Print Permit  11/3/2014 DONE
Inspection Record Card- Fire11/3/2014 11/3/2014 DONE
DetailsKristal Soland
Intake Approval  10/29/2014 PASS
Plan assigned to (Tim)10/29/2014 10/29/2014 DONE
DetailsTim Frost
Sprinkler Plan Check10/29/2014 10/29/2014 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/29/2014 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/29/2014 DONE
DetailsTim Frost
Application received  10/15/2014 DONE
Application submitted via PDS Online on Oct 15 2014 8:15PM