Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberFIR14-00782
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 1109 W MAIN ST
Project NameOwyhee Place Red Sky TI
Customer Number 
ePlanReviewYes
Description
Quick Permit
RECONFIGURE THE HEADS AND ARM OVERS IN THE AREA OF WORK. THE NEW HEAD LAYOUT IS TO ACCOMMODATE THE REMODEL AND COMPLY WITH NFPA 13 STANDARDS. THE EXISTING 2 1/2" MAIN WILL STAY IN PLACE WITH EXISTING EARTHQUAKE BRACING AND THE LINES WILL BE TAPPED FOR NEW LINE AND HEAD LOCATIONS.

(RED SKY - 4TH STORY - HISTORIC OWYHEE PLACE) Fire sprinkler system used for story, height, and area increase. To create a 2,796 square foot office tenant space on the 4th story of the historic portion of the Owyhee Place Building. Work is to include interior nonbearing walls, suspended acoustical ceilings, suspended gypsum board ceilings, interior side-hinged swinging doors, interior sliding doors, interior windows, millwork, and finishes. To construct a non-rated corridor to connect the stairway enclosures serving the 4th story so that all occupants will have access to 2 exits from the 4th story after leaving their tenant space without passing through a stairway enclosure. Work is to include interior nonbearing walls, handrails to serve existing steps, suspended acoustical ceilings, suspended gypsum board ceilings, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/19/201411/19/201411/19/2014APASS
DetailsForrest France
Fire sprinkler work passed final walkthrough and inspection. Permit finaled.
INSP-Final Inspection11/17/201411/17/201411/17/2014APART
DetailsForrest France
Final pending ceiling tile and escutcheons.
INSP-Sprinkler Rough-in11/14/201411/14/201411/14/2014PPART
DetailsForrest France
Okay to cover overhead fire sprinkler work at the SW common corridor grid ceilings.
INSP-Sprinkler Rough-in11/13/201411/13/201411/13/2014PPART
DetailsForrest France
Remainder of overhead fire sprinkler work at the remodel area approved for cover.
INSP-Sprinkler Rough-in11/10/201411/10/201411/10/2014PPART
DetailsForrest France
Fire sprinkler work at rooms 406 and 407 okayed for sheetrock ceiling cover.
INSP-Sprinkler Rough-in11/4/201411/4/201411/4/2014PPART
DetailsForrest France
Okayed for cover at the elevator lobby sheetrock ceiling.
Permit Ready to Issue  10/27/2014 DONE
DetailsCandy A. Nichols
Issue and Print Permit  10/27/2014 DONE
DetailsCandy A. Nichols
Inspection Record Card- Fire10/27/2014 10/27/2014 DONE
DetailsCandy A. Nichols
Sprinkler Plan Check10/23/2014 10/23/2014 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/23/2014 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/23/2014 DONE
DetailsTim Frost
Plan assigned to (Tim)10/22/2014 10/22/2014 DONE
DetailsTim Frost
Intake Approval  10/22/2014 PASS
Application received  10/21/2014 DONE
Application submitted via PDS Online on Oct 21 2014 7:17AM