INSP-Final Inspection | 4/21/2015 | 4/21/2015 | 4/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 4/7/2015 | 4/7/2015 | 4/7/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush pass
|
INSP-Sprinkler Rough-in/Hydro | 2/19/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground hydo test failed
|
INSP-Sprinkler Rough-in | 10/28/2014 | 10/28/2014 | 10/28/2014 | P | PART |
Forrest France
|
|
|
UG fire supply line from the point of connection at the property line to and including the IBR approved for bury. Ref. to dated annotations on plans.
|
Plan assigned to (Tim) | 10/24/2014 | | 10/24/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 10/24/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 10/24/2014 | | 10/24/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/24/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/24/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/24/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/24/2014 | | 10/24/2014 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 10/23/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2014 7:46AM
|