Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR14-00801
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2396 N 14TH PL
Project NamePrescott Residence
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of protecting a single level residence.

WUI Zone A, Class A Roof, Permit for the construction of a new 1,065 sq. ft., one story single family dwelling (1 bedroom, 1 bathroom, approximately 260 sq. ft. of covered patio/porch) with detached 336 sq. ft. detached garage with 376 sq. ft. attached shop and 393 sq. ft. of living space above (2 bonus rooms, 1 half bathroom).
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/19/20158/20/20158/20/2015APASS
DetailsJim Page
Final inspection passed/complete
CHANGE STATUS TO (ISS)  8/19/2015 DONE
INSP-Final Inspection6/11/20156/11/20156/11/2015PFAIL
DetailsJim Page
This is not a final inspection, this was an underground cover inspection (Pot Marked Inspection for proper cover depth) and an underground flush. Pipe is at an approved depth and supply line is flushed/complete
INSP-Conference6/10/20156/11/20156/11/2015ADONE
DetailsJim Page
Verfied with on site contact, "pot marks" are being provided to verify underground piping cover.
INSP-Final Inspection5/12/20155/18/20155/18/2015AFAIL
DetailsTroy Cobbley
No head located over riser in riser room.

Fire bell not located on street side of building, bell also needs sticker installed

No record of underground being approved for cover.

No record of underground flush witness.

No backflow preventer installed on fire riser.

CPVC riser mounted to far from wall.
INSP-Sprinkler Rough-in2/11/20152/11/20152/11/2015PPART
DetailsForrest France
Overhead work approved for cover, tenting and insulation install verified.
INSP-Sprinkler Rough-in2/3/20152/3/20152/3/2015PPART
DetailsForrest France
Verified stamped plans on site, completed overhead rough-in inspection. * NOTE: Need to verify tenting insulation prior to cover. No record to date of an UG fire supply line inspection prior to bury.
INSP-Sprinkler Rough-in1/30/20152/2/20152/2/2015ANR
DetailsForrest France
Missing approved plans on site. Need to verify cold cavity protection at riser transitions to upper ceiling levels.
Permit Ready to Issue  12/23/2014 DONE
Issue and Print Permit  12/23/2014 DONE
Inspection Record Card- Fire12/23/2014 12/23/2014 DONE
DetailsKristal Soland
Sprinkler Plan Check12/22/2014 12/22/2014 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  12/22/2014 DONE
DetailsTim Frost
Sprinkler Plan Check11/4/2014 11/4/2014 FAIL
DetailsTim Frost
1st review completed  11/4/2014 FAIL
DetailsTim Frost
Miscellaneous action  11/4/2014 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Plan assigned to (Tim)11/3/2014 11/3/2014 DONE
DetailsTim Frost
Intake Approval  11/3/2014 PASS
Application received  10/30/2014 DONE
Application submitted via PDS Online on Oct 30 2014 8:06AM