INSP-Final Inspection | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Forrest France
|
|
|
UG fire supply line permit final approved.
|
INSP-Supply line flush | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test completed satisfactory.
|
INSP-Sprinkler Rough-in | 11/10/2014 | 11/10/2014 | 11/10/2014 | P | PART |
Forrest France
|
|
|
Okay to cover remainder of UG fire supply line. Ref. to dated annotations on plans.
|
INSP-Sprinkler Rough-in | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PART |
Forrest France
|
|
|
UG at plus 20' beyond previous inspection okayed for cover
|
INSP-Sprinkler Rough-in | 11/6/2014 | 11/6/2014 | 11/7/2014 | P | PART |
Tim Frost
|
|
|
Partial underground was ok to cover. Inspected (3) joints starting at the riser.
|
Plan assigned to (Tim) | 11/6/2014 | | 11/6/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 11/6/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 11/6/2014 | | 11/6/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/6/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/6/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/6/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/6/2014 | | 11/6/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 11/5/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 5 2014 2:16PM
|