INSP-Final Inspection | 1/22/2015 | 1/22/2015 | 1/22/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 1/21/2015 | 1/22/2015 | 1/22/2015 | A | CANC |
Troy Cobbley
|
|
|
Lerren Phone #: ###-####
|
INSP-Final Inspection | 1/12/2015 | 1/12/2015 | 1/12/2015 | P | FAIL |
Troy Cobbley
|
|
|
A surface mounted light is blocking a pendant sprinkler head
|
INSP-Sprinkler Rough-in | 11/12/2014 | 11/12/2014 | 11/12/2014 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered. Per dicussion wood framing will need to be covered in the interstitial space prior to a final sign off.
|
Intake Approval | | | 11/7/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/7/2014 | | 11/7/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/7/2014 | | 11/7/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/7/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/7/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/7/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/7/2014 | | 11/7/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 11/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2014 10:34AM
|