INSP-Final Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Inspection Record Card- Fire | 2/27/2015 | | 2/27/2015 | | DONE |
Candy A. Nichols
|
|
|
as per Tim Frost-change address
|
INSP-Sprinkler Rough-in | 2/19/2015 | 2/20/2015 | 2/20/2015 | A | PASS |
Troy Cobbley
|
|
|
forward flush passed
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2015 | 2/10/2015 | 2/10/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro and rough-in passed.
|
INSP-Sprinkler Rough-in | 2/5/2015 | 2/6/2015 | 2/6/2015 | A | PASS |
Troy Cobbley
|
|
|
Remaining hardlids are ok to cover piping.
|
INSP-Sprinkler Rough-in | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Troy Cobbley
|
|
|
Piping above both restrooms and below both stair ways is ok to cover as marked on the city approved plans.
|
Sprinkler Plan Check | 11/25/2014 | | 11/25/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 11/25/2014 | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
(F) Reprint permit | | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 11/25/2014 | | 11/25/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 11/14/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/14/2014 | | 11/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/14/2014 | | 11/14/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 11/14/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/14/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 11/6/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2014 1:43PM
|