INSP-Final Inspection | 3/3/2015 | 3/4/2015 | 3/4/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled. Corrections made and as-builts submitted
|
INSP-Final Inspection | 3/2/2015 | 3/3/2015 | 3/3/2015 | A | FAIL |
Troy Cobbley
|
|
|
Provide strobe in the Restroom and provide as-builts showing this addition to plan review. Relocate smoke detectors to with in 5'-0" of doors as discussed. Need to test the fire sprinkler riser interconnects, need document box and map posted and signage on fire alarm room door.
|
Permit Ready to Issue | | | 11/17/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/17/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/17/2014 | | 11/17/2014 | | DONE |
Christina Prado
|
|
|
|
1st review completed | | | 11/13/2014 | | PASS |
|
|
|
|
Alarm Plan Check | 11/13/2014 | | 11/13/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/13/2014 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Plan assigned to (Lee) | 11/12/2014 | | 11/12/2014 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 11/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 11 2014 3:29PM
|