INSP-Final Inspection | 12/11/2014 | 12/12/2014 | 12/12/2014 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
Miscellaneous action | | | 11/25/2014 | | PASS |
|
|
|
Took in as built drawings.
|
INSP-Sprinkler Rough-in | 11/20/2014 | 11/21/2014 | 11/21/2014 | A | PART |
Forrest France
|
|
|
Overhead work approved for cover at the sheetrock lid ceilings as marked and dated on stamped plans. Need plan modification for deleted heads prior to permit final as discussed.
|
INSP-Sprinkler Rough-in | 11/19/2014 | 11/20/2014 | 11/20/2014 | A | CANC |
Troy Cobbley
|
|
|
Cancel per Justin and mine discussion. Phone #: ###-####
|
Permit Ready to Issue | | | 11/14/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/14/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/14/2014 | | 11/14/2014 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 11/13/2014 | | 11/13/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 11/13/2014 | | PASS |
|
|
|
|
Sprinkler Plan Check | 11/13/2014 | | 11/13/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/13/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/12/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 12 2014 2:03PM
|