INSP-Final Inspection | 2/4/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PART |
Forrest France
|
|
|
Verified additional coverage opposite the new wall at the laundry room area 1st floor.
|
INSP-Sprinkler Rough-in | 12/2/2014 | 12/3/2014 | 12/9/2014 | P | PART |
Forrest France
|
|
|
Scope of work approved for cover at the remodel area. Need to relocate one existing pendent head at the laundry due to new wall.
|
Override - Parcel Holds | | | 11/17/2014 | | |
|
|
|
|
Permit Ready to Issue | | | 11/17/2014 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/17/2014 | | |
|
|
|
|
Issue and Print Permit | | | 11/17/2014 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 11/17/2014 | | |
|
|
|
|
Inspection Record Card- Fire | 11/17/2014 | | 11/17/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/14/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/14/2014 | | 11/14/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/14/2014 | | 11/14/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/14/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/13/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 13 2014 8:01AM
|