INSP-Final Inspection | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/23/2015 | 3/24/2015 | 3/24/2015 | P | CANC |
Troy Cobbley
|
|
|
Mike B is your contact on site. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 3/20/2015 | 3/23/2015 | 3/23/2015 | P | CANC |
Troy Cobbley
|
|
|
Canceled due to the project related fire alarm permit not being scheduled
|
INSP-Sprinkler Rough-in | 2/12/2015 | 2/13/2015 | 2/13/2015 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered.
|
INSP-Sprinkler Rough-in/Hydro | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in/Hydro | 2/9/2015 | 2/10/2015 | 2/10/2015 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro tests passed, rough-in passed except the pendant heads in the restrooms are too close together based on extended coverage requirements. Tenting was not complete. Pipe not to be covered.
|
INSP-Sprinkler Rough-in | 2/9/2015 | 2/10/2015 | 2/9/2015 | P | CANC |
Troy Cobbley
|
|
|
RTC inspection. Mike M is your contact. Please call 1/2 hour prior to inspection. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 12/17/2014 | 12/18/2014 | 12/18/2014 | A | PASS |
Troy Cobbley
|
|
|
underground supply line ok to cover
|
Permit Ready to Issue | | | 11/25/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/25/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/25/2014 | | 11/25/2014 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 11/24/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/24/2014 | | 11/24/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/24/2014 | | 11/24/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/24/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 17 2014 11:55AM
|