INSP-Final Inspection | 4/2/2015 | 4/2/2015 | 4/2/2015 | A | PASS |
Forrest France
|
|
|
Final walkthrough and acceptance testing completed acceptable. Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in/Hydro | 3/23/2015 | 3/24/2015 | 3/24/2015 | A | PART |
Forrest France
|
|
|
Completed overhead inspection for both the first and second floor systems. Rough-in passed.
|
INSP-Sprinkler Rough-in | 3/23/2015 | 3/23/2015 | 3/23/2015 | P | DEFR |
Forrest France
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PART |
Forrest France
|
|
|
Completed satisfactory hydrostatic test of both new overhead systems.
|
INSP-Sprinkler Rough-in/Hydro | 3/18/2015 | 3/18/2015 | 3/18/2015 | A | NR |
Forrest France
|
|
|
don forester Phone #: ###-#### Inspection requested via web by Brodie Stenquist
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2015 | 3/10/2015 | 3/10/2015 | P | CANC |
Troy Cobbley
|
|
|
Could not make it for a hydro test. Don is going to reschedule
|
Sprinkler Plan Check | 12/10/2014 | | 12/10/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/10/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 12/10/2014 | | 12/10/2014 | | DONE |
Candy A. Nichols
|
|
|
|
Permit Ready to Issue | | | 12/10/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/10/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/10/2014 | | 12/10/2014 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 12/9/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/9/2014 | | 12/9/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/1/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 1 2014 11:14AM
|