INSP-Final Inspection | 4/2/2015 | 4/3/2015 | 4/6/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro passed. Overhead rough-in passed. Don and I discussed close out items needed for a final.
|
INSP-Sprinkler Rough-in/Hydro | 3/25/2015 | 3/26/2015 | 3/26/2015 | A | PART |
Troy Cobbley
|
|
|
Underground flush passed, overhead hydro failed & only the rough-in in the west tenant passed. Will need as-builts showing the additional branchline and changes.
|
Permit Ready to Issue | | | 2/20/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/20/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/20/2015 | | 2/20/2015 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 12/30/2014 | | 12/30/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/16/2014 | | 12/16/2014 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 12/16/2014 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/16/2014 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 12/15/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/15/2014 | | 12/15/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/3/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 3 2014 12:07PM
|