INSP-Final Inspection | 3/18/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Forrest France
|
|
|
UG fire supply line flush completed. Overhead system charged and flow tested. Verified dry upright at the attic, final walkthrough finished. Permit finaled.
|
INSP-Sprinkler Rough-in | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed, piping is ok to cover except at the rise up the the gas fired unit.
|
INSP-Sprinkler Rough-in | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | PART |
Forrest France
|
|
|
Rough-in at the first and second floors completed acceptable. Dry upright at the attic HVAC equipment not yet installed. Cover at the second floor is not approved pending tenting install and inspection.
|
Intake Approval | | | 12/11/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/11/2014 | | 12/11/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/11/2014 | | 12/11/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/11/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/11/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/11/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/11/2014 | | 12/11/2014 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 12/4/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 4 2014 10:00AM
|