INSP-Final Inspection | 1/28/2015 | 1/30/2015 | 1/30/2015 | A | FAIL |
Troy Cobbley
|
|
|
Everything tested ok except the access control system needs to be connected to the FACP as per IFC Chapter 10. As-builts showing this work as well as the candella changes in the Lobby and Office will be required prior to a final sign off.
|
Permit Ready to Issue | | | 12/18/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/18/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/18/2014 | | 12/18/2014 | | DONE |
Kristal Soland
|
|
|
|
Alarm Plan Check | 12/17/2014 | | 12/17/2014 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/17/2014 | | PASS |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Plan resubmittals received | | | 12/16/2014 | | DONE |
|
|
|
|
Plan assigned to (Lee) | 12/12/2014 | | 12/12/2014 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 12/12/2014 | | FAIL |
|
|
|
See review comments.
|
Application received | | | 12/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2014 11:51AM
|
FIR-Aging Inspection | 8/6/2020 | 8/6/2020 | | | |
Troy Cobbley
|
|
|
|