INSP-Final Inspection | 2/9/2015 | 2/11/2015 | 2/11/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 2/9/2015 | 2/9/2015 | 2/9/2015 | P | PASS |
Troy Cobbley
|
|
|
Too close uprights have modified.
|
INSP-Final Inspection | 1/30/2015 | 2/2/2015 | 2/2/2015 | A | PART |
Forrest France
|
|
|
Completed inspection for relocated upright coverage at the warehouse areas due to new and removed walls. Plastic coatings room 205 is not ready for inspection at this time.
|
INSP-Sprinkler Rough-in | 1/30/2015 | 2/2/2015 | 2/2/2015 | A | PART |
Forrest France
|
|
|
Okay to cover overhead work at the front office area grid ceilings.
|
INSP-Sprinkler Rough-in | 1/15/2015 | 1/16/2015 | 1/16/2015 | P | PASS |
Troy Cobbley
|
|
|
Hard lids at restrooms are ok to cover.
|
Sprinkler Plan Check | 1/14/2015 | | 1/14/2015 | | PASS |
Tim Frost
|
|
|
|
1st review completed | | | 1/14/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/14/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/14/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Issue and Print Permit | | | 1/14/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Inspection Record Card- Fire | 1/14/2015 | | 1/14/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Miscellaneous action | | | 12/20/2014 | | PEND |
|
|
|
A fire sprinkler anaylsis must be performed on this facility before this review and continue.
|
Intake Approval | | | 12/19/2014 | | FAIL |
|
|
|
|
Plan assigned to (Tim) | 12/19/2014 | | 12/19/2014 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 12/19/2014 | | PEND |
|
|
|
Could not read Owner's Certificate. On hold pending new copy.
|
Application received | | | 12/10/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 10 2014 12:19PM
|