INSP-Final Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | A | PASS |
Forrest France
|
|
|
Scope of work completed. Fire sprinker permit finaled.
|
INSP-Sprinkler Rough-in | 2/2/2015 | 2/3/2015 | 2/3/2015 | A | PART |
Forrest France
|
|
|
Verified previous correction notice items. Rough-in passed
|
INSP-Sprinkler Rough-in | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | FAIL |
Forrest France
|
|
|
Missing hangers at the 21/2" main and 2" main per plan, noted a leak at the NW corner branchline/main fit tee.
|
Intake Approval | | | 12/12/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/12/2014 | | 12/12/2014 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/12/2014 | | 12/12/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/12/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2014 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/12/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/12/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/12/2014 | | 12/12/2014 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 12/11/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 11 2014 2:59PM
|