INSP-Final Inspection | 5/21/2015 | 5/22/2015 | 5/22/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Final Inspection | 5/19/2015 | 5/20/2015 | 5/20/2015 | A | CANC |
Troy Cobbley
|
|
|
Project related fire alarm permit not called in for inspection.
|
INSP-Final Inspection | 5/18/2015 | 5/19/2015 | 5/19/2015 | A | FAIL |
Troy Cobbley
|
|
|
1.No pressure relief valve installed. 2. Backflow assembly neededs to be tested by certified backflow tester. 3. Forward flush needs to be performed. 4. No ball drip on FDC. 5. Fire alarm needs to be retested.
|
INSP-Final Inspection | 5/13/2015 | 5/14/2015 | 5/14/2015 | A | FAIL |
Troy Cobbley
|
|
|
No inspection was performed due to the fire alarm monitoring system not being complete. Also the tamper switch for the PIV has not been installed.
|
INSP-Sprinkler Rough-in/Hydro | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro and rough-in passed
|
Miscellaneous action | | | 2/23/2015 | | DONE |
|
|
|
Spoke with the designer in regards to addtional elbows in branch line. The hydraulic calculations are still adequate for this project.
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro test passed.
|
Permit Ready to Issue | | | 12/26/2014 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/26/2014 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/26/2014 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/26/2014 | | 12/26/2014 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 12/23/2014 | | 12/23/2014 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 12/23/2014 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2014 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 12/22/2014 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 12/22/2014 | | 12/22/2014 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 12/17/2014 | | DONE |
|
|
|
Application submitted via PDS Online on Dec 17 2014 10:22AM
|