Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR14-00920
StatusFinaled
Name ALARMCO
Site Address 4141 W NEZ PERCE ST
Project NameHillcrest View Apartments FACP
Customer Number 
ePlanReviewYes
Description
The installation is for a new addressable fire alarm system with manual pulls at all breezeways and low frequency horns in all apartment sleeping bedrooms. Not associated with a building permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/6/20155/8/20155/8/2015PPASS
DetailsTroy Cobbley
Permit finaled
INSP-Final Inspection4/21/20154/23/20154/22/2015AFAIL
DetailsTroy Cobbley
Inspection actually performed on 4/21/2015 but not scheduled. Missing document box and it appears an additional monitor module is needed to monitor the new NAC panel. Also only one surge protector was installed at the FACP instead of the two as shown on the plans. As-builts needed showing these changes prior to a final sign off.
Telephone call  4/14/2015 DONE
Jeremy - We can have two inspectors available for the final inspection on this fire alarm project Tuesday April 21st at 1pm. We can commit up to two hours to perform this final inspection. I encourage your team to pre-test the system ahead of time to resolve any initiating device reporting issues or notification appliance synchronization/audibility issues prior to the City field inspectors arrival. This will expedite the field inspection process. The following items below will be points of emphasis during the final inspection:

• Smoke detectors will need to be smoked and report accurately to the FACP;
• Pull stations will be tested and checked for accurate reporting at the panel;
• Notifications appliances will be checked for location, functionality and synchronization in required areas;
• Verification of fire alarm system map with device addresses, function, and location to be at the panel within an approved cabinet;
• Verification of alarm reporting to the Central Service station monitoring facility will also be checked…


Scott Arellano
PDS/Fire Division
Plan Review and Field Inspection Supervisor
###-####
sarellano@cityofboise.org
INSP-Final Inspection4/1/20154/3/20154/3/2015PDEFR
DetailsForrest France
Overbooked - need advance notice to confirm time and staffing available to complete inspection as requested.
INSP-Final Inspection3/23/20153/30/20153/30/2015PDEFR
DetailsForrest France
Telephone call  3/5/2015 DONE
Ray of Alarmco call to see if it was acceptable to have double pole breakers powering multiple NAC panels at seperate buildings. I informed him that it was not allowed since a breaker tripping for one panel would affect another. Also, is a knox box required to gain access to the panel. I informed him that it was.
Permit Ready to Issue  1/14/2015 DONE
Issue and Print Permit  1/14/2015 DONE
Inspection Record Card- Fire1/14/2015 1/14/2015 DONE
DetailsBrittany Hill
Alarm Plan Check1/12/2015 1/12/2015 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  1/12/2015 DONE
Resubmittal approved with review comments. Projectdox updated.
Plan resubmittals received  1/9/2015 DONE
Plan assigned to (Lee)1/2/2015 1/2/2015 DONE
DetailsLee G Meredith
1st review completed  1/2/2015 FAIL
See 1st review comments.
Miscellaneous action  1/2/2015 DONE
Emailed applicant failed review comments.
Application received  12/19/2014 DONE
Application submitted via PDS Online on Dec 19 2014 10:54AM