INSP-Final Inspection | 3/17/2015 | 3/19/2015 | 3/20/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 3/19/2015 | 3/20/2015 | 3/20/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 2/23/2015 | 2/25/2015 | 2/25/2015 | P | FAIL |
Troy Cobbley
|
|
|
Everything is ok except the insulation at the new duct/roof penatrations needs to be repaired.
|
INSP-Final Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | P | DEFR |
Forrest France
|
|
|
Charles Lamb to attend Phone #: ###-#### Inspection requested via web by Connie Danes
|
Issue and Print Permit | | | 1/16/2015 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Tim) | 12/31/2014 | | 1/15/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/15/2015 | | 1/15/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2015 | | DONE |
Tim Frost
|
|
|
|
Telephone call | | | 1/15/2015 | | DONE |
Christina Prado
|
|
|
Called American FIre to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 1/15/2015 | | DONE |
Christina Prado
|
|
|
|
Inspection Record Card- Fire | 1/15/2015 | | 1/15/2015 | | DONE |
Christina Prado
|
|
|
|
Plan resubmittals received | | | 1/14/2015 | | DONE |
|
|
|
Received 3 copies of revised plans, calcs, and applications
|
Sprinkler Plan Check | 1/12/2015 | | 1/12/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/12/2015 | | FAIL |
Tim Frost
|
|
|
|
Telephone call | | | 1/12/2015 | | DONE |
Christina Prado
|
|
|
called American Fire to advise resubmittals are needed
|
Application received | | | 12/31/2014 | | |
|
|
|
|