INSP-Final Inspection | 5/28/2015 | 5/28/2015 | 5/28/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Troy Cobbley
|
|
|
rough-in passed
|
INSP-Final Inspection | 4/8/2015 | 4/9/2015 | 4/10/2015 | A | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Rick
|
INSP-Final Inspection | 4/6/2015 | 4/6/2015 | 4/6/2015 | P | CANC |
Troy Cobbley
|
|
|
Overbooked. Inspection will need to be rescheduled. Tried to leave message on contacts voice mail. Cole Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 2/11/2015 | 2/11/2015 | 2/11/2015 | P | PASS |
Troy Cobbley
|
|
|
Three hard lids in the east end of the building are ok to cover.
|
INSP-Sprinkler Rough-in | 2/5/2015 | 2/5/2015 | 2/5/2015 | P | PASS |
Troy Cobbley
|
|
|
Rough-in for upper piping passed. A follow up inspection will be required for the armovers and drops
|
Intake Approval | | | 1/13/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/13/2015 | | 1/13/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/13/2015 | | 1/13/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/13/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/13/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/13/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/13/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/13/2015 | | 1/13/2015 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 1/12/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 12 2015 10:52AM
|