INSP-Final Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Final Inspection | 2/26/2015 | 2/27/2015 | 2/27/2015 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler modifications approved for ceiling cover. Final pending field ceiling tile throughout, escutcheons, finishes.
|
Meeting | | | 2/27/2015 | | DONE |
Scott Arellano
|
|
|
Meeting on site with General contractor and PDS/Fire inspection regarding request for TCO. Remaining basic life safety items in need of correction include:
1) Addition of two new exit signs at lobby directing occupants to the protected stairwell enclosures;
2) replace two non funtioning exit signs. One existing sign at North corridor near electrical room and the 2nd sign which intermittingly turned on and off during emergency power test;
3) install all ceiling tiles sprinkler escutcheons.
General contractor agreed to make corrections over the weekend and call in for reinspection Monday morning. Building owner was also present and was approved to begin tenant process of moving in office furniture.
|
Intake Approval | | | 1/16/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/16/2015 | | 1/16/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/16/2015 | | 1/16/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/16/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/16/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/16/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/16/2015 | | 1/16/2015 | | DONE |
Kristal Soland
|
|
|
|
Application received | | | 1/15/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 15 2015 10:13AM
|