Case Summary | | | 6/6/2016 | | DONE |
|
|
|
|
DOC - Permit Finaled | | | 6/23/2015 | | DONE |
|
|
|
Per Pass inspection 6/19
|
INSP-Final Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Katie Marron
|
|
|
Smoke detectors in sleeping rooms, relocated away from vent and tested. Building map provided. Scope of work complete. Permit Finaled.
|
INSP-Final Inspection | 6/19/2015 | 6/19/2015 | 6/19/2015 | P | PART |
Katie Marron
|
|
|
The following items need to be corrected: Smoke detectors in the three sleeping rooms need to be moved so as not to be within 3' from ceiling A/C unit. Building map posted by panel. All functional testing complete. Sleeping room smokes shall be retested.
|
Permit Ready to Issue | | | 2/3/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/3/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/3/2015 | | 2/3/2015 | | DONE |
Brittany Hill
|
|
|
|
Alarm Plan Check | 1/30/2015 | | 1/30/2015 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 1/30/2015 | | DONE |
|
|
|
Plans approved with review comments. Projectdox updated.
|
Miscellaneous action | | | 1/20/2015 | | DONE |
|
|
|
I emailed Jonathan Ahten to let him know the sounder bases that he submitted do not meet the 520Hz requirements for sleeping rooms. He submitted another device but this one is not listed with the detector or the panel. I emailed again to let him know and to let me know what he finds that is listed.
|
1st review completed | | | 1/20/2015 | | FAIL |
|
|
|
Sounder bases do not meet code requirement of 520Hz alarm signal in sleeping rooms. Rob Ahten is going to resubmit proper equipment. Electronic submittal failed on pre-screen review.
|
Application received | | | 1/16/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 16 2015 10:14AM
|