INSP-Final Inspection | 4/30/2015 | 5/1/2015 | 5/1/2015 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 4/23/2015 | 4/24/2015 | 4/24/2015 | A | CANC |
Troy Cobbley
|
|
|
Canceled due to fire alarm panel not being functional yet.
|
INSP-Sprinkler Rough-in/Hydro | 4/22/2015 | 4/22/2015 | 4/22/2015 | P | PART |
Troy Cobbley
|
|
|
Overhead hydro test passed. Rough-in passed for the most part. Missing two longitudinal braces on the 1 1/2" main and two branch line restraints under the mezzanine. Need updated/approved plans showing the pipe sizing and pipe routing changes under the mezzanine prior to a final sign off.
|
INSP-Supply line flush | 4/16/2015 | 4/17/2015 | 4/17/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground flush of the remote FDC and the underground supply passed
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2015 | 4/16/2015 | 4/16/2015 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line and remote FDC hydro tests passed
|
INSP-Sprinkler Rough-in | 4/10/2015 | 4/10/2015 | 4/13/2015 | P | PASS |
Troy Cobbley
|
|
|
Remaining underground ok to cover
|
INSP-Sprinkler Rough-in | 4/8/2015 | 4/9/2015 | 4/9/2015 | P | PART |
Troy Cobbley
|
|
|
Supply line rough-in passed. Just missing thrust blocks and one fitting on the remote FDC. Vault also needs to be installed prior to cover.
|
Sprinkler Plan Check | 3/3/2015 | | 3/3/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/3/2015 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/3/2015 | | DONE |
Candy A. Nichols
|
|
|
|
Sprinkler Plan Check | 2/6/2015 | | 2/6/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/6/2015 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/6/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/6/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/6/2015 | | 2/6/2015 | | DONE |
Kristal Soland
|
|
|
|
Sprinkler Plan Check | 1/23/2015 | | 1/23/2015 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/23/2015 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 1/23/2015 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 1/21/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/21/2015 | | 1/21/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/19/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 19 2015 7:32AM
|