INSP-Final Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PART |
Forrest France
|
|
|
Sprinkler system modifications per the scope of work approved for grid ceiling cover. *Note- existing sprinkler piping above the exterior entry may be subject to freeze potential due to the new drop ceiling, sheetrock to deck and lack of HVAC.
|
Permit Ready to Issue | | | 1/29/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/29/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/29/2015 | | 1/29/2015 | | DONE |
Kristal Soland
|
|
|
|
Intake Approval | | | 1/28/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/28/2015 | | 1/28/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/28/2015 | | 1/28/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/28/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 1/26/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 26 2015 3:21PM
|