INSP-Final Inspection | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in | 2/18/2015 | 2/19/2015 | 2/19/2015 | A | CANC |
Forrest France
|
|
|
No one showed up so Troy called in for another time 2-18-15 blh //Troy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 2/18/2015 | 2/18/2015 | 2/18/2015 | A | PART |
Forrest France
|
|
|
Fire sprinkler work okay for cover at the sheetrock lid ceilings. Grid ceilings and heads above the sales areas are not yet complete.
|
INSP-Sprinkler Rough-in | 2/17/2015 | 2/17/2015 | 2/18/2015 | P | DEFR |
Forrest France
|
|
|
|
Permit Ready to Issue | | | 1/29/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/29/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/29/2015 | | 1/29/2015 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 1/28/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jan 28 2015 12:01PM
|
Intake Approval | | | 1/28/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/28/2015 | | 1/28/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/28/2015 | | 1/28/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 1/28/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/28/2015 | | DONE |
Tim Frost
|
|
|
|