INSP-Final Inspection | 7/24/2015 | 7/24/2015 | 7/24/2015 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | P | PART |
Troy Cobbley
|
|
|
Permit will be ok to final when the existing/demo'd sprinkler piping has been removed. Trip time is under 60 seconds
|
INSP-Alarm Testing | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | FAIL |
Jim Page
|
|
|
Dry system trip test failed, time for water discharge at inspectors test 70 seconds.
|
INSP-Sprinkler Rough-in | 6/25/2015 | 6/26/2015 | 6/26/2015 | A | PASS |
Jim Page
|
|
|
Dry system hydrostatic test passed/complete
|
INSP-Alarm Testing | 6/24/2015 | 6/25/2015 | 6/25/2015 | P | PART |
Jim Page
|
|
|
24 hr air test passed/complete
|
INSP-Alarm Testing | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PART |
Troy Cobbley
|
|
|
24-hour air test started at 12:30 with 41 psi on guage.
|
Permit Ready to Issue | | | 2/11/2015 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/11/2015 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/11/2015 | | 2/11/2015 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 2/10/2015 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/10/2015 | | 2/10/2015 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/10/2015 | | 2/10/2015 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 2/10/2015 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/10/2015 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 2/2/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 2 2015 11:22AM
|